• Hydrogen Production and Hydrogenation Integrated Station
  • Hydrogen Production and Hydrogenation Integrated Station
  • Hydrogen Production and Hydrogenation Integrated Station
  • Hydrogen Production and Hydrogenation Integrated Station
  • Hydrogen Production and Hydrogenation Integrated Station

Hydrogen Production and Hydrogenation Integrated Station

Customization:
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Beijing, China
to see all verified strength labels (18)

Product Description

Changshen Lubao--Integrated Energy Station
Hydrogen refueling station type: a comprehensive energy station integrating PSA tail hydrogen purification hydrogen production device, analytical gas recovery, LNG refueling station, hydrogen filling mother station, 35MPa and 70MPa hydrogen refueling station, charging station and gas station
 
Hydrogen Production and Hydrogenation Integrated Station
Hydrogen Production and Hydrogenation Integrated Station
Hydrogen Production and Hydrogenation Integrated Station


Project Background:
The project is jointly developed and constructed by Shanghai Shenergy Energy Development Co., Ltd. and Shanxi Lubao Group, covering an area of 13,888.3 square meters, with a total investment of 53.5 million yuan and an annual output of about 20,000 tons of fuel cell high-purity hydrogen. The project is planned once and implemented in phases.
At present, after the first phase of the project is put into operation, the scale of hydrogen production and refueling can reach 6 tons/day, and the daily filling capacity can reach 24 tons/day, which can meet the daily operation needs of 30 hydrogen refueling stations in the city.
 
H&T provides: design, production, supply, construction, installation, commissioning, performance experiment, final completion acceptance, and personnel training of process equipment, ancillary facilities and equipment of hydrogen refueling station equipment and system facilities.

Hydrogen Production and Hydrogenation Integrated StationHydrogen Production and Hydrogenation Integrated Station
AFTER-SALES SERVICE

Fast service time
With a 100-person after-sales service team, the whole team is divided into four regions: North China, East China, South China and Southwest China, which can realize the fastest arrival at the scene within 2 hours, and troubleshooting within 4 hours.


High professional quality
average hydrogen industry work experience of after-sales service team personnel is more than 3 years, having capabilities of independent processing and analysis; all personnel get a professional after-sales system-wide training so to meet the clients' operation and maintenance, maintenance and training and other types of needs.


Good user experience
The after-sales service personnel carry out active inspection of equipment from time to time as well as free maintenance and warm hearted action, so as to realize early discovery and solution of problems, reduce the incidence of equipment failure and improve customer satisfaction.


Low maintenance fee
The maintenance of equipment outside the warranty period adopts the system of flat fee and large customer preference, allowing customers to pay less money to use more stable equipment.

Hydrogen Production and Hydrogenation Integrated Station

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000